madigirl320 madigirl320
  • 25-01-2018
  • Mathematics
contestada

a stadium has a direct staffing costs of 108,000. Overherhead costs (socially security, medicare, worker's compensation, etc.) cost the stadium an additional 15%. What is the total staffing cost?

Respuesta :

chloebeardsleeoz0d4c chloebeardsleeoz0d4c
  • 25-01-2018
I think the answer is 124,200.
Answer Link

Otras preguntas

The value of the given digits in the numbers 7s in 775 823 159
What does the typical mixture of air on earth composed of
Evaluate the formula V = Bh, if B = 24 and h = 6. V = 4 V = 12 V = 30 V = 144 NEXT QUESTION ASK FOR HELP TURN IT IN © 2014 Glynlyon, Inc. All rights reserved.
An automobile engineer is revising a design for a conical chamber that was originally specified to be 12 inches long with a circular base diameter of 5.7 inches
What is 506,709 in word form
Issues led to the great schism between the eastern and western christian churches
After President Johnson adopted much of Lincoln's plan for Reconstruction, what are two additional things he did that upset Congress?
How to solve this equation
Two tectonic plates move toward each other at _______ boundaries. A. convergent B. divergent C. transform D. oceanic
How do you solve this equation