Johnson's rule gives optimal answer for what type of scheduling problems?

Respuesta :

Etta217
Etta217 Etta217
  • 06-11-2017
The answer is two-machine flow shop. The two-machine flow shop issue in which each activity is prepared through an in-house framework or outsourced to a subcontractor. A calendar is set up for the in-house employments, and execution is measured by the makespan.
Answer Link

Otras preguntas

How did the Second Great Awakening encourage people to reform their lives.
What is 20% of $29.95?
2/3 + 2/3 please answer
In a hydrogen ion pump, the energy is used to join small molecules together to make larger ones. Which factor most likely has the greatest effect on the number
He stood where he had arisen, opened his mouth, and broke out the long, heart-broken puppy wail. But even this he was not allowed to complete. In the middle of
Which statement correctly identifies the cause-and-effect relationship?
What was Washington’s role in the French & Indian War? Why did he become famous?
What is the medical term for the surgical removal of the ovaries?
Frankie washed 15 cars in three hours. How many cars can he wash in seven hours? It’s either 35 or 41.
7. Which of the following has the greatest mass? a. 2 mol H20. b. 2 mol NH3 c. 2 mol CH4