jordidiaz8104 jordidiaz8104
  • 23-07-2017
  • Business
contestada

âa(n) ________ starts with the assumption that current activities in a company will not automatically continue in the next period.

Respuesta :

andriansp andriansp
  • 31-07-2017
A zero based budget starts with the assumption that current activities in a company will not automatically continue in the next period.
Zero based budget is designed to justify all existing expense in order to find out the true value of a company, which means that this method will not recognize any form of earning and liabilities that haven't been actualized by the company.
Answer Link

Otras preguntas

A sample contains 18.0 g N2 (MW = 28.02 g/mol), 50.5 g He (MW = 4.00 g/mol), and 34.6 g CO2 (MW = 44.01 g/mol). Calculate the mole fraction of carbon dioxide
If the volume of a sphere is 972π cubic cm, what is its radius?
Consider the polynomial function P(x)=2x⁴ +3x²+12.Find P(−2).
Shana wants to use all 62 feet of the fencing she has to make a rectangular run for her dog. She decides to make the length of the run 20 feet. She writes and s
Solve the following problems first using a tape diagram and then by setting up an equation. For each, give your opinion on which solution method was easier. Can
1. What challenges and/or dangers would you face as a settler ?
Divide 1 3/5 divided by 1/4 A) 3/20 B) 1 3/20 C) 1 2/5 D) 6 2/5
PLEASE ANSWER I NEED IT ASAP Simplify. 89+(−56) ________ 16 Enter your answer, in simplest form, in the boxes
Express each of the following in a+bi form.a)(1+i)²b)(1+i)⁴c)(1+i)⁶
tell why winston is not killed each time he is tortured