glashial glashial
  • 24-03-2017
  • Mathematics
contestada

31 workers are working on a construction site. 5 more workers work for company A than for company B. How many workers work for each company?

Respuesta :

LOLOLbnana LOLOLbnana
  • 24-03-2017
13 I believe as 31-5=26/2=13 Hope you'll find this helpful
Answer Link
tumber1235
tumber1235 tumber1235
  • 25-04-2021

Answer:

13 is b

Step-by-step explanation:

Answer Link

Otras preguntas

The radius of a circle is 4. The diameter is 8. The radius of a triangle is 8. The diameter is 16. Which shape has the least amount of square feet?
a chef uses 3 3/4 pounds of semolina flour and 1 5/8 pound whole wheat flour for each batch of pasta she makes.one week she uses a total of 86 pounds of flour W
Which group of intellectual women established literary clubs of their own around 1750 under the leadership of Elizabeth Vesey and Elizabeth Montagu? a) the Behn
Roxanne has 1/2 as many beads as Sherie. The number of beads Sherie has is 4/5 that of Marcos. Marcos has 165 beads. How many more beads does Marcos have than R
What is the largest part of the earth: the core,the mantle, or the crust
What are 2 thirds of 800
Hi, can you help with this problem:(-50)/2
Help with problem 14?!
if f(x)=2x+1,what is f(-3)
sin 48,59 = 0,75, maka cos 138,59 =