Differentiate between the scheduling techniques known as CPM and PERT

Respuesta :

foreverronneshia foreverronneshia
  • 25-03-2022
PERT is for Program Evaluation and Review Technique, whereas CPM stands for Critical Path Method. PERT is used to manage unpredictable activities, whereas CPM is used to manage predictable ones. PERT is concerned with events, whereas CPM is concerned with activities.
Answer Link

Otras preguntas

If the molecules in the above illustration react to form nh3 according to the equation n2 + 3 h2 2 nh3 ,.
Cost behavior is considered linear whenever ______. . a) the difference between cost and activity is zero a straight line approximates b) the relationship bet
CHAPTER II-THE SHE-WOLF, an excerpt From White Fang By Jack London Breakfast eaten and the slim camp-outfit lashed to the sled, the men turned their backs on th
determine whether the following conjecture is true or false if n is a prime number then n+1 is not prime
Question 6 of 10 What was true of the Treaty of Versailles?
the gasses in a hair spray can are at temperature 300k and a pressure of 30 atm, it the gasses in the can reach a pressure of 90 atm the can will explode. To wh
Please answer this question down below. (35 Points)
3. (a) What is paragraph?
identify at list five teaching methods of non participatory method ?​
Use the following terms to create a poem or summary about the lesson. 1. Civil societies 2. Diversity 3. Famine 4. Immigrants 5. Nativist Industrialization 6. P