naykambreea naykambreea
  • 23-03-2022
  • Mathematics
contestada

it takes a work crew 12 days to build 4 houses. How many days does it take to build one house?

Respuesta :

crt10789
crt10789 crt10789
  • 23-03-2022

Answer:

it takes 3 days for the crew to make one house

Answer Link

Otras preguntas

Can someone please help !
When transferring a patient from the bed to a stretcher, position the stretcher vertical with the bed.quizlet
(1) bullying has a significant impact on a student's physical and emotional well being. (2) there are many school programs that will help stop bullying. (3) est
A machine has a cost of $15,000, an estimated residual value of $3,000, and an estimated useful life of four years. The machine is being depreciated on a straig
Which of the following systems of equations has the solution (1, 6)? y = –5x – 1 y = –x + 7 y = 5x + 1 y = x – 7 y = 5x + 1 y = –x – 7 y = 5x + 1 y = –x + 7
Which of these is an example of investigating an intensive property? Oweighing sand in a bag Omeasuring the length of wire O determining if a rock is magnetic O
The reaction between A2 (two large red spheres) and B2 (two small blue spheres) to produce AB is shown in the diagram. The reactants contain 4 A 2 molecules and
what conclusion can be drawn about human origins on a map
When testing the temperature of catalase, what would happen if you changed the temperature using the same tube with the same catalase and hydrogen oxide mixture
What are the roots of the polynomial equation x superscript 4 baseline x squared = 4 x cubed minus 12 x 12? use a graphing calculator and a system of equations.