Respuesta :

irisf12346
irisf12346 irisf12346
  • 26-02-2022

Answer:

45

Step-by-step explanation:

n/15=30

therefore n=450

hence n/10 = 45

Answer Link
Zoyalane
Zoyalane Zoyalane
  • 26-02-2022

Answer:

45 days

Step-by-step explanation:

If 15 men = 30 days

1 man=30*15

1 man = 450 days

10 men = 450/10=45

Answer Link

Otras preguntas

Eric and frank want to equally share 4/3 feet of rope. What length of rope should each friend get? Explain how to use a drawing to help solve the problem.
A population of 3.5 million bacteria increases by 488000 . How many bacteria are there now?
a chef uses 3 3/4 pounds of semolina flour and 1 5/8 pound whole wheat flour for each batch of pasta she makes.one week she uses a total of 86 pounds of flour W
A pork roast was taken out of a hardwood smoker when its internal temperature had reached 180°F and it was allowed to rest in a 75°F house for 20 minutes after
Maren walks 3/5 miles in 24 minutes at a steady pace.  How long does it take her to walk 2 miles.
What is 12/16 in it's lowest term
in 3 months Us energy giant Enron went from a company with assets of 62bn to a company with depts of 18bn What is the difference between these two amounts?
the highest recorded temperature in the uk is 39° c. the lowest recorded temperature in the uk is - 27° c What is the difference between these two amounts?
Hi, can you help with this problem:(-50)/2
How do you solve (2x+y)*(y+4x) ?