contestada

20 labourers complete the construction of a building in 24 days.in how many days would 16 labourers complete the work in 12 days ?​

Respuesta :

Аноним Аноним
  • 21-08-2021

Answer:

Step-by-step explanation:

Ver imagen Аноним
Answer Link

Otras preguntas

What are the eight differences between personal selling (direct contact) and non-personal selling (indirect contact, such as Internet sales)?
pls answer this question
Mikhail has $4.15. If he buys one pack of candy canes, how much money does he have left? (the candy canes are $2.45 FOR A PACK OF 4 candy canes)
Lucas is walking around the edge of the playground shown. How far will lukas have to walk when he finishes one loop around the playground? Round to the nearest
TIME REMAINING 01:57:26 Which of the following is a historical example of a United States president expanding the powers of office based on a decision rather th
A worker is spray painting doors. It takes LaTeX: \frac{2}{5} 2 5 of a can of spray paint to paint 1 door. The worker has 2 cans of spray paint total. How many
The width and length of a rectangular flower bed are in the ratio 5:7. The width is 40 feet. What is the length?
pray petition protest was the major policy of​
frankie can build a speaker box in 120 minutes trash can build a speaker box 40 minutes faster if they work together how many minutes does it take them to build
What is the ellos preterite form of the verb pedir? O pedieron O pusieron O pidieron O pidió