Which two questions can be used to identify time and cost constraints on the
design of a heavy industrial machine?
O A. Does it move the payload at 5.0 m/s?
B. Can it be completed within 120 days?
C. Will it cost less than $10,000?
D. Can it carry a load of 45,000 kg?
E. Does it have visual appeal for the public?