TyreeSerini163 TyreeSerini163
  • 24-03-2014
  • Mathematics
contestada

Six people to can perform a task in 8 days. If we add 2 equally able people, how long would it take?

Respuesta :

madankapoor10
madankapoor10 madankapoor10
  • 24-03-2014
1 man does 1/48th piece of work per day
then 8 man do 1/6th piece of work per day
so they can do the work in 6 days

Answer Link
salmheiri
salmheiri salmheiri
  • 21-02-2022

Answer:

6 days

Step-by-step explanation:

Answer Link

Otras preguntas

(17.7) x (11.4) Show the work that helped you solve it please
A 35.0- g bullet strikes a 5.0- kg stationary piece of lumber and embeds itself in the wood. The piece of lumber and the bullet fly off together at 8.6 m/s. Wha
What is the change in the scale factor from the old scale to the new scale? Old: 1 inch = 3.3 feet. New: 1 inch = 1.1 feet. 1 to 3 1 to 2.2 2.2 to 1 3 to 1
When amusement parks charge customers for admission and later for food and beverages, they are following a _________ pricing strategy. I. Skimming II. Two-part
Why are the characters committed to nonviolence during their protest? Requires at least 2 pieces of evidence from the text. Standing Up By Sitting In Article: S
Describe one result of the Great Society.
In at least 600 words, write an essay discussing one of the following themes from The Miracle Worker. In your essay, discuss your choice by responding both to (
100.2and 19.400 which is greater​
PLS PLS PLS HELP ME!!!​
A man and woman with normal color vision produced two colorblind sons and two daughters with normal color vision, What are the genotypes of the parenter Show yo