jennibalaoing
jennibalaoing jennibalaoing
  • 24-05-2021
  • Mathematics
contestada

Johnson Construction Company is going to build a house on a concrete slab. The slab is to have dimensions 30 feet by 20 feet by 2 feet. How many cubic feet of concrete should the construction company order

Respuesta :

ursupacool ursupacool
  • 27-05-2021

Answer:

1200ft^3

Step-by-step explanation:

30 x 20 x 2= 1200^3

Answer Link

Otras preguntas

Can someone please help me
How did Chris in the movie “The pursuit of happyness” show persistence?​
The region of a long bone that articulates with another bone at a joint is the A) Epiphyseal plate B) Epiphysis C) Diaphysis D) Medullary Cavity
20 points if you help (08.02 MC) A pair of equations is shown below: y = 6x − 4 y = 5x − 3 Part A: In your own words, explain how you can solve the pair of equa
What effect did World War II have on empires that had been created by European nations?
Muscle that compresses the abdomen a. Transverse abdominis b. Rectus abdominis
I’m not sure if it’s in the correct order
A tennis player receives a shot with the ball (0.0600 kg) traveling horizontally at 50.4 m/s and returns the shot with the ball traveling horizontally at 37.0 m
Graph the solution of this inequality: 9 (35x - 14) < 24 + 3
what is light intensity? ​