mianazaer9aler mianazaer9aler
  • 23-11-2016
  • Mathematics
contestada

If total costs are $650 and fixed cost is 0, what are average variable costs, if production is 10 units?

Respuesta :

nobillionaireNobley
nobillionaireNobley nobillionaireNobley
  • 24-11-2016
Total cost = fixed cost + variable cost
650 = 0 + VC
VC = 650
AVC = VC/quantity = 650/10 = 65
Average Variable cost = $65
Answer Link

Otras preguntas

2x7=9 Can anybody help me with this??
A is the point (8, 5) and B is the point(- 4, 1).Calculate the length of AB. *
which part of the chemical structure differentiates one amino acid from another?
Horse racing should be banned or not
explain the dimensions of legal system?​
1 Do you think we need to produce more food or change our consumption habits? Why? 2 Are you willing to pay more for locally grown food? Why or why not?
this question is from pillers of Islam explain why the Ramzan fast is important to the Muslims. (4 marks). ​
If I have 39 campers divided into groups of 6 with 1 counselor assigned to each group, what is the least number of camp counselors that will be needed
Redrawn Gacha life character. (Don't trust the smile)
The vertices of a triangle are P(-8, 6), Q(1, -3), and R(-6, -3). Name the image of P after a reflection over y = 2, and then shifted right 3 units.