tagalakenneth49 tagalakenneth49
  • 23-02-2021
  • Mathematics
contestada

If two men can finish a piece of work in 30 days, then how many men will be required to finish the same work in 10 days?

Respuesta :

Аноним Аноним
  • 23-02-2021

If two men can finish a piece of work in 30 days, then how many men will be required to finish the same work in 10 days?

it would take a half of man to finish the same piece of work in 10 days.

Answer Link

Otras preguntas

x + y = 12 x - y = 10 What is the value of the x-determinant for the system shown? a)-22 b)-12 c)-2
A student claims that cellular respiration is essential to cells so that they have a means for getting rid of excess carbon dioxide. What is wrong with his stat
Escribe la forma correcta de ser o estar en la siguente oración. La chica ________ muy seria.
Find two consecutive counting numbers whose squares differ by 35.
Mechanical weathering occurs at a greater rate in climates that are
how much water can be held by a cylindrical tank with a radius of 12 ft and a height of 30ft
What might happen if an economic geographer did not interview citizens when preparing a city transportation plan?
After factoring the polynomial, how do you determine which values of the variable make the original expression undefined?
A circle with the equation (x + 3)2 + (y - 2)2 = 25 is reflected over the line x = 2. What is the equation of the image?
Disadvantages of friction