hwiles0104 hwiles0104
  • 23-09-2020
  • Mathematics
contestada

A repair company charges $60 per hour of work.the repair company works 7 hours on a job.what is the total charge.

Respuesta :

jrspamstuff24
jrspamstuff24 jrspamstuff24
  • 23-09-2020

Answer: $420

Step-by-step explanation:

60 dollars x 7 hours = 420$

Answer Link

Otras preguntas

What is Emerson’s opinion of the fugitive slave act?
The volume of a cylinder is 1000 cubic meters. The radius is 8.5 meters. Determine the height of the cylinder. Use 3.14 for \piπ. Round to the nearest tenth, if
BRAINLIEST!!!!! Histograms are used for data sets that are __________ and cover more of a __________. Histograms break down the range into smaller _____________
This vehicle can decelerate from 60m/s to O m/s in 3 seconds. Calculate the rate of deceleration.​
Farm subsidies were started in the united states to __________.a.promote large-scale farming over small farm cooperativesb.increase commodity prices to provide
Brian has ridden 38 miles of a bike course. The course is 40 miles long. What percentage of the course has Brian ridden so far?​
Two squares have areas of 4 cm? and 16 cm?. What is the ratio of the side length of the smaller square to the side length of the larger square?
Question Write the product using exponents. 6.4⋅6.4⋅6.4⋅6.4⋅b⋅b⋅b Using exponents, the product is .
How to end an article ​
A water manometer is used to measure the pressure of a gas supply