katherineye2007
katherineye2007 katherineye2007
  • 24-07-2020
  • Mathematics
contestada

Mark can dig a ditch in 4 hours. Greg can dig the same ditch in 3 hours. How long would it take them to dig it together?

Respuesta :

StarVAng
StarVAng StarVAng
  • 24-07-2020

Answer:

1 hour and 43 minutes

Step-by-step explanation:

Add both of theyre work hours together you get 3/12 and 4/12

Then you add both 3/12 4/12

You get 7/12

They complete the job 12/7 hours =1 5/7 (1 hour 43minutes)

Answer Link
brynnxin brynnxin
  • 04-02-2022

Answer:

1 5/7

Step-by-step explanation:

Answer Link

Otras preguntas

helpppppppppppppppppppppppppppppp
helppppppppppppppppppppp
helppppppppppppppppppppppppppp
Exciting the electrons in an iron increases the energy in the iron atom which can cause heating how might a magnetic field be used to excite electrons in atoms
I need answer for this question asap I will give brainliest
A man can crack a nut by applying a force of 100 N a lever of length 0.5 m. What should be the length of the lever if he wants to use a force of 75 N to crack t
Which expression is equivalent to the given expression? (-1/4x) (1/2x - 3/4) Answer choices -1/12x² + 3/4x 1/8x²- 3/16x 1/12x² - 3/4x -1/8x² + 3/16x​
the triangle in the figure had a hypotenuse equal to 40 units what is the approximate length of x 25.7 units 30.6 units 47.7 units 52.2 units (Srry I’m spamming
A survey team is trying to estimate the height of a mountain above a level plain. From one point on the plain, the team observes that the angle of elevation to
a javelin is thrown at 28.5m/s from flat ground at a 43.2 degree angle. How long does it take to reach its maximum height? IN SECONDS​