michellemorrison
michellemorrison michellemorrison
  • 23-04-2020
  • Mathematics
contestada

If 12 workers are needed to run 4 machines, how many workers are needed to run 20 machines

Respuesta :

2020hw
2020hw 2020hw
  • 23-04-2020

Answer:

60 workers

Step-by-step explanation:

4 machines= 12 workers

20 machines= 60 workers

You multiply by 5

Answer Link

Otras preguntas

find the value and round to four decimal places for sin 47 PLEASEEEEE HELP!
The technique used by groups to generate as many ideas as possible within a limited amount of time is called
How would you describe the theme of "Homesick" compared to that of "Breathes There the Man"? A)Both are similar, but "Homesick" has a lighter, more accepting vi
An important consequence of the defeat of the spanish armada was that
Write an equation that has a hole at x = 4 and a vertical asymptote at x = -3.
Classify each of the following as homozygous dominant, heterozygous, or homozygous recessive. A.Gg B.rr C.TT D.Does not include any dominant alleles E.Does not
The price of binders and paper decreases: would the price decrease or increase and would the quantity decrease or increase. Also what would be the determinant (
Which of the following steps could be used as a shortcut method to multiply 12 by 50
Choose the sentence that has an error. (A.)the bronze statue was considered by experts to be very best in the exhibit. (B.)the cool weather in October was more
With whom is Gulliver engaged in a character vs. character conflict? A. Glumdalclitch B. the king C. the farmer