jhirst515
jhirst515 jhirst515
  • 22-04-2020
  • Computers and Technology
contestada

During the initiation phase the user needs are looked at in some detail, they are called..?

A=User focus
B=User targets
C=User requirements

Respuesta :

CreamyPi314
CreamyPi314 CreamyPi314
  • 22-04-2020

Answer:

C

Explanation:

User requirements are the needs of the users, even though some people get confused and think that user requirements are not needs, but in fact prerequisites. However, this is incorrect for the workplace states that needs are required to be fulfilled.

Answer Link

Otras preguntas

Harry Truman was born in this state.
-1/2(24+6x)=-3(x-4) solve for x
5(3x - 11) - 9x +30 +(6x + 22) - 8(3 - x)simplify​
A person stands on a scale in an elevator. The maximum and minimum scale readings are 814.7 N and 321.8 N, respectively. The acceleration of gravity is 9.8 m/s
Anna has 1/2 hour of free time. She divides the time equally between walking her dog and playing her favorite song on the piano. If she plays the song 3 times,
Tim deposits money in a certificate of deposit account. The balance (in dollars) in his account t years after making the deposit is given by T(t) = 1000(1.06)t
A state's legislative branch
2. What is an ionic bond?
Complete the following sentences about enzyme function: Enzymes speed reaction rates by ______ and lowering activation energy. Activation energies drop because
Where's the location of the process of photosynthesis inside of a cell. I need the most superb answer so I'm asking you to please, answer clearly.