tomgikaria tomgikaria
  • 21-04-2020
  • Physics
contestada

A crane lifts a 400 N crate full of baked beans 15 m. How much work was done by the crane?

Respuesta :

muhammadtalhabinyous
muhammadtalhabinyous muhammadtalhabinyous
  • 21-04-2020

Answer:

6000 J

Explanation:

work = F x S

work = 400 x 15

work = 6000 J

Answer Link

Otras preguntas

experts agree that the minimum time period for cardiorespiratory benefit from exercise is ___minitues
Ellen is paid $35 an hour but gets time and a half on Sunday's. How much would she receive if she worked 6 hours on Sunday?
TRIGONOMETRIC RATIOS: A ship is 130m away from the center of a barrier that measures 180m from end to end. What is the minimum angle that the boat must be turne
There were 70 runners to start a race. In the first half of the race, 1/5 of them dropped out. In the second half of the race, 4/7 of the remaining runne
Can you help me with -5x^2+18x+8? (Its number 34.)
jen makes a rectangular banner. it is 3/4 yard long and 1/4 yard wide. what is the area, in square yards of the banner
How did industrialization and economic growth help to ignite the Russian Revolution?
Magnets are often fitted to the doors of refrigerators and cupboards WHY?
A catering service offers 5 appetizers, 8 main courses, and 7 desserts. A banquet chairperson is to select 3 appetizers,4 main courses, and 4 desserts for a ba
Why does Alexander the Great still matter today?