kalpanathakulla680 kalpanathakulla680
  • 23-02-2020
  • Business
contestada

30 men can do a piece of work in 40 days .how long it take to complete the work if 5 men were reduced​

Respuesta :

kandelhira20
kandelhira20 kandelhira20
  • 23-02-2020

Answer:

it is from unitary method

men days

30 40

25 let(x)

now from indirect variation

25×x = 30×40

25x= 1200

x=1200÷25

x=48

so there were 48men to complete the work

Answer Link

Otras preguntas

The heart, liver, and stomach are each examples of A. a tissue. B. an organ system. C. a nerve. D. an organ.
The genetic code is a sequence of DNA nucleotides. In eukaryotic cells, the DNA is located in the nuclei of the cells. The genetic code is nearly universal in t
When looking at a rational function f of x equals the quantity x plus three times the quantity x minus two times the quantity x plus five all divided by the qua
What kinds of change did church critics want to make?
what is 36% of 80/ show work
how do substances move in active transport
What would the tone of Walt Whitman's poem "I Hear America Singing" be if the people in the poem were speaking rather than singing?jovialless hopefulmore hopefu
During 2002, the average person ate 220.8 pounds of meat. How much meat does a family of 3 people eat in year? 662.4 pounds 331.2 pounds 217.8 pounds 62.9 pound
How many keys does a standard student bassoon have on the left or top thumb?
Can a mutation in a DNA sequence be corrected by DNA enzymes?