bobmarlytocoll8587 bobmarlytocoll8587
  • 24-01-2020
  • Social Studies
contestada

What term refers to a smaller version of an organizational change intended to test the proposed change and improve it before rolling it out to the entire organization?

Respuesta :

bogadu
bogadu bogadu
  • 25-01-2020

Answer:

Pilot project

Explanation:

Pilot project is an experimental project in an organization to study the feasibility of carrying out overall change. It is more like a test run of the organizations change move. It helps to manage the risk involved with drastic changes. If the result of the pilot project is not positive, the management can either discard the change idea of make modifications and test run the idea again.

Answer Link

Otras preguntas

What is the value of h? h = 20 h = 35 h = 55 h = 70
Which of these would be considered the leader of an Autocracy? A) President B) Dictator C) Prime Minister D)
why will your result be an underestimate of the actual nerve conduction velocity?
Stock A has a beta of .68 and an expected return of 8.1 percent. Stock B has a beta of 1.42 and an expected return of 13.9 percent. Stock C has beta of 1.23 and
What is the value of s?
write 5/8 as a decimal.
What is the correct estimate for this sum?
How do you think light is produced ?
Explain the environmental challenges facing a rapidly developing Asia. Identify three challenges faced on this continent.
A girl received $100 for her birthday. At the store she can buy 1 video game and 3 DVDs for $100. She could ask buy 2 video games and 1 DVD for $100. Write and