makaylarae6390 makaylarae6390
  • 22-08-2019
  • Computers and Technology
contestada

Why do we need long-term schedulers? Wouldn't be possible to handle the same job using

short-term schedulers? Why?

Respuesta :

Cetacea
Cetacea Cetacea
  • 04-09-2019

Answer:

The scheduling process in the system is done by using the long-term scheduler and short-time scheduler. The long term scheduler are those which select the work from the job queue and the job selection is not very frequent.

Short-term scheduler is the scheduler that select the work from the ready queue and allocates it to the CPU(Central processing unit).It works by picking the work at quick frequency .So, it is not possible for the short-term schedulers to handle the job because of the different frequency of work.

Answer Link

Otras preguntas

What is the symbol for postassium
Who was the commander of the continental army in the revolutionary war?
yall recommend any good shows/movies on netflix or hulu ?
The Country Times offers a 20% discount on a Saturday ad that also runs on Sunday. The local department store contracts for a ¼ page ad to run every Saturday an
My hubby takes 3 hours to respond help
Matching chromosomes
The water content of soil from a borrow site is normally distributed with a mean of 14% and a standard deviation of 2.5%. What is the probability that a sample
las muchachas ____ muy bonita’s
Assuming that the long term rate of displacement along the San Andreas Fault (about 3.5 cm/year) remains the same and that the location of the fault remains the
A farm distributor packed 2,650 melons in boxes.each box can hold 8 melons. All the boxes are full except for one box.