bwheeler8209 bwheeler8209
  • 26-02-2019
  • Business
contestada

Who can sign a determination and findings justifying the use of an award-fee contract

Respuesta :

MrsTriplet MrsTriplet
  • 07-03-2019

A person that in at least one level higher than the contracting officer is allowed to sign a determination and findings justifying the use of an award-fee contract. An award fee contract is defined as additional profit or fee aount that is awarded based on evaluations during different periods of time for contractors on their performance. This type of evalution is done based on the specific company and their needs.  

Answer Link

Otras preguntas

what events happened beforeloyalists left boston and philadelphia?
What is the simplest form for the product 3/5 •25/36 is?
What is the simplest form for the product 3/5 •25/36 is?
What is the simplest form for the product 3/5 •25/36 is?
what events happened beforeloyalists left boston and philadelphia?
what is the difference between dividing 16 by 2 and finding the square root of 16
what is the difference between dividing 16 by 2 and finding the square root of 16
The equation s x  2 5 can be used to estimate the speed, s, of a car in miles per hour, given the length in feet, x, of the tire marks it leaves on the ground.
The equation s x  2 5 can be used to estimate the speed, s, of a car in miles per hour, given the length in feet, x, of the tire marks it leaves on the ground.
what is 4 over 9 minus 1 over 12 equal simplified?