elicollins316 elicollins316
  • 21-09-2018
  • Mathematics
contestada

concrete can be made by mixing cement, sand and gravel in the ratio 3:6:8. how much gravel is needed to make 850 cubic meter of concrete?

Respuesta :

ayrianaschaubowmrit
ayrianaschaubowmrit ayrianaschaubowmrit
  • 21-09-2018

400 cubic meters of gravel is needed to make 850 cubic meters of concrete.

If you wanna know how I got my answer then just ask. :)

Hope this helped!

Answer Link

Otras preguntas

What are the four functions of the central bank?.
the short-run supply curve of a purely competitive producer is based primarily on its group of answer choices atc curve. afc curve. mc curve. avc curve.
Why is it easier to fix errors in modular programs than in non-modular programs? OA. Because errors in a single module are easier to identify and edit B. Becaus
What is the step that is labeled D? metaphase I metaphase II telophase II telophase I
What is the solution QR to this system of linear equations 12q 3r 15?.
Graph the equation y = −4/3x+4
TRUE/FALSE. if you try to retrieve a value from a dictionary using a nonexistent key, a keyerror exception is raised.
What is the Nez Perce Tribe known for?.
Why are latitude and longitude important?
How did Samuel Johnson influence the English language?.