essick2463 essick2463
  • 22-05-2018
  • Biology
contestada

When mrp ii systems include feedback to revise a plan that is not feasible, they are known as?

Respuesta :

LearnGrow
LearnGrow LearnGrow
  • 31-05-2018
MRP stands for Manufacturing Resource Planning.
When MRP II systems include feedback to revise a plan that is not feasible, they are known as closed loop MRP. The closed loop MRP includes products that have been returned by retail stores, or products that did not meet the manufacturer's quality control standards. 
It is used for production planning and inventory control.
Answer Link

Otras preguntas

What country is completely surrounded by south africa
The reaction of 1.250 g k with o2 forms 2.273 g of an oxide of potassium that is used in self-contained breathing devices. determine the formula for this oxide
(1 + 2i) • (5 − 3i) 5 - 6i 11 + 7i 3+2i 2-15
tenesa bought a 50 pound bag of flour for her bakery. she used 13.65 pounds of flour. how many pounds of flour are left in the bag?
Describe the white blood cell’s role in protection against infection
The Mayflower Compact was unique because it A) was the foundation for the Declaration of Independence. B) allowed black colonists freedom centuries before
find the density of a substance whose volume is 5 cm^3 and whose mass is 25 g.
In which part of the chloroplasts are the calvin cycle enzymes located?
You are making a rectangular poster to advertise a school fundraiser. You want the poster to be twice as long as it is wide. Let w represent the width (in meter
Select the answer that best completes this sentence: Mi mamá es _______.