Alpha can do a piece of work in 20 days. beta is 25% more efficient than alpha. The number of days taken by beta to do the same piece of work is
a. 15
b. 16
c. 18
d. 25

Respuesta :

Otras preguntas

Simplify the following expression. -i^6 · i^3 · i^-5
There were 7 1/2 tubs of icecrem. A serving of icecrem is 1/6 of tub. How many servings of icecrem remains? Help
How did southerners resist Abraham Lincoln reconstruction plan
Bill drew a rectangle with a perimeter of 16 inches. Then he drew a square with the perimeter of 16 inches. draw three different rectangles bill could have draw
Which elements are distinct to drama and not typically found in other written stories?
why is it important to thin the blood of someone having a heart attack, but not for someone having a stroke?
Which word from the paragraph helps the reader understand the meaning of the underlined word? I am always amazed at the garb women had to wear in olden times.
what is the potential energy of a 30 Newton ball that is on the ground
Which underlined word in the sentence is a possessive pronoun? Mom's pie is delicious, but I am also happy with the way mine turned out. A. delicious B. mine C
What is 2.4x =48 equal