alexiahall9045 alexiahall9045
  • 21-03-2024
  • Business
contestada

If A can complete a job in 12 days and B is 60% more efficient than A, how many days would it take for B to finish the work?

Respuesta :

Otras preguntas

1. In the summer of 1942, the United States began fighting a different kind of war in the Pacific than it had been fighting up to that point. Military leaders h
What problems did the Americans face in providing the necessary supplies and equipment for the war and in paying for them? What were the American advantages and
Who commanded the U.S forces in the invasion of Normandy?
Which involves making economic choices based on customs? market economy traditional economy command economy mixed economy
13.2 The subjunctive with doubt, disbelief, and denial Completar Completa cada oración con la forma correcta del verbo apropiado de la lista. word bank haber
The specific heat of Aluminum is 0.9 J/g K. How much heat is lost as a 100 gram sample of Aluminum is dropped into a beaker of water and its temperature drops
Sarah wants to go sky-diving. In order for her to safely sky-dive, she must be 200 pounds of less. Right now, she weights 231 pounds. She decided to work out an
The costs of different sizes of bottled sport drink are shown. Which bottle costs the least per ounce? size 8oz 16oz 24oz 32oz price $0.89 $1.09 $1.89 $2.
Read the sentence below and answer the question that follows. Let us not discuss the economy of this country; let us also not discuss the spending habits of
A 291 kg motorcycle moves with a velocity of 7 m/s. What is its kinetic energy? Joules