dakotakk6247 dakotakk6247
  • 25-02-2024
  • Computers and Technology
contestada

A project has a budget of $6,600,000. Planning and design fees are estimated at $700,000 and construction expenses are estimated at $5,100,000. What is the amount of a 10% construction contingency?
a. $510,000
b. $510,500
c. $500,100
d. $500,000

Respuesta :

Otras preguntas

Jane mixes 5 3/4 cups of water and 3 1/2 cups of cranberry concentrate in a jug. What is the ratio of water to cranberry concentrate in the jug?
16.69 as a mixed number
how to solve this problem by elimination 3x+y=17 4x+2y=20
What happens to an electromagnetic wave when the frequency is doubled?
If a person were fasting and hadn t eaten for several days in a row, which source of energy would the body use as a last resort?
5x−y=14 in slope intercept form y=_
what is equivalent to 4/21
What is the slope of a line that passes through points (-1, 4) and (4, 9)?
Which statement about the Pacific Theater in World War II is true? A. At the Battle of Midway, Japanese planes sank four American aircraft carriers. B. G
discuss the role of family members in assisting in the process of making informed decisions about starting an own business