oliverotis2713 oliverotis2713
  • 25-01-2024
  • Mathematics
contestada

the construction engineer calculated that he needed eight pillars of equal size for the new building at the Board of Education. he ordered one third of a ton of concrete to make the support pillars. How much concrete does he use for each support pillar

Respuesta :

Otras preguntas

Use the diagram of a pyramid to answer the question. What is the volume of the pyramid? A. 1508 m3 B. 1624 m3 C. 2436 m3 D. 4872 m3
Jack is fishing on a pier that is 2 feet above the water. When he casts his rod, the hook on his line lands 8 feet below water. What is the total distance his
9.721 rounded to the nearest hundredth​
is it possible for a number to be both a whole number and an integer
EMT-B and EMT-I/99 are trained alike. They do not provide stand-alone medical care even the EMT-I/99 can never provide on-scene treatment. False True
PLEASE HELP ME XOXO 2х + Зу = 18 6х + 5 = 46
how is personal development linked to psychology
Which of the following archaeological sites may have been built to align with the sun, an indicator that during the Neolithic Era, beliefs changed and the physi
What is the name of Liberia president? ​
what does mr tumnus phrase daughter of eve mean?