tsimm6079 tsimm6079
  • 23-01-2024
  • Mathematics
contestada

Rajesh takes 10 days less than the time taken by Manish to finish a piece of work. If they together can finish the work in 12 days, find the time taken by Manish to finish the work.

Respuesta :

Otras preguntas

How long does it take for a 12.62g sample of ammonia to heat from 209K to 367K if heated at a constant rate of 6.0kj/min? The melting point of ammonia is 195.42
(lc)what did the united states hope to gain from the purchase of alaska?
According to this diagram, what is cos 16?
A man enters the hospital complaining of chest pain. his history includes smoking, a stressful job, a diet heavy in saturated fats, lack of exercise, and high b
Which of the following was a cause of the French and Indian war
What are the possible rational zeros of f(x) = x4 + 2x3 – 3x2 – 4x + 20?
A gas is __________ and assumes __________ of its container whereas a liquid is __________ and assumes __________ of its container. a gas is __________ and assu
Added years of longevity and health plus financial stability have granted an active, opportunistic time of life to so many older adults that some experts believ
What makes a piece of literature gothic
In his 1933 inaugural address, president roosevelt called for: