rjblair2393 rjblair2393
  • 22-01-2024
  • Engineering
contestada

When presenting a cost estimate on an ABN for a potentially noncovered service, the cost estimate should be within what range of the actual cost?

1)$25 or 10 percent
2)$100 or 10 percent
3)$100 or 25 percent
4)An exact amount

Respuesta :

Otras preguntas

2 dice are rolled. What is the probability that the sum of the numbers rolled is a number greater than or eaqual to 5
What is 1/4 of 10 explain
Factor out the GCF 7x+49
What are the factors of -72 that add up to -15
What's the square root of 119?
Background Info:The standard enthalpy of formation (ΔH∘f) is the enthalpy change that occurs when exactly1 mol of a compound is formed from its constituent elem
complete the equation Fe + HOH = ?
An artificial lake is in the shape of a rectangle and has an area of 9/20 square mile. The width of the lake is 1/5 the length of the lake. What are the dimensi
What's the square root of 119?
What is 1/3 of $55,000.00