robin8794 robin8794
  • 25-05-2023
  • Business
contestada

The safety stock for an item is 150 units, and the lead
time is two weeks. If the lead time changes to three weeks,
calculate the new safety stock.

Respuesta :

Otras preguntas

Allusion about napolean bonaparte
Which value of c makes y^2+8y+c a perfect square A. 4 B.16 C.64 D.8
What is the pitch of a sound wave?
what is a rarefaction
A student notices that an inflated balloon gets larger when it is warmed by a lamp. Which best describes the mass of the balloon as a result of this change?   A
In this parallelogram, the measure of     angle b    exceeds the measure of   angle a by 30        What is the measure of  angle c
please help me i dont get it
Which is the ocean is the largest
When a bicycle rider puts on the brakes of a bicycle, friction cause some of the mechanical energy to change into what type of energy?
Inverse VariationIf I varies inversely with R and I = 0.15 when R = 50, which equation should be used to show this relationship?   A.I=7.5/R  B.I=7.5R  C.IR=0.7