The critical path for the network activities shown below is _____ with duration ______.
A. A-C; 12
B. A-D-E; 19
C. B-E; 13
D. A-B-C-D-E; 29
E. none of the choices

Respuesta :

Otras preguntas

Solve this system of equations using substitution: y=2x-4 x+2y=10 And could someone show work how please?
The Panama Canal passes through Gatun Lake, which eventually empties into a larger body of water. According to the map, the Panama Canal begins in a-miraflores
which expression is equivalent to 5(2x - 7) A. 2x - 35 B. 7x - 2 C. 7x - 12 D. 10x - 7 or E. 10x
i need to know how to do # 1 & #2 & #3
Sasha answered 85% of the trivia question right what fraction describes this percent
What is the structure of an Italian sonnet? a) two quatrains followed by a sestet b) three quatrains followed by a couplet c) an octave followed by a sestet d)
There are 914.4 millimeters in a yard. There are 3 feet in a yard. How many millimeters are in a foot?
Why does molotov believe a "second front" should be opened in 1942?
windows does not require users to know commands for
Which of the following countries is considered the top “green” country in the world? New Zealand Australia Antarctica Papua New Guinea