ShanaeRR7625 ShanaeRR7625
  • 21-10-2022
  • Engineering
contestada

technician a says that if a fuse blows as soon as it is installed, a short to ground is indicated. technician b says the component will not turn off if the short to ground is on the ground side of the load component but before a grounding switch. who is correct?

Respuesta :

Otras preguntas

What is the algebraic expression for this story problem?A tank is filling with water from a natural spring well. Two days ago the water was 10 feet deep, and ye
What role do media, such as virtual worlds, play in shaping gender stereotypes?
How and why did the antislavery movement become more radical over the period 1815 to 1860?
Rationalize the denominator and simplify-[tex] \frac{ \sqrt{6} }{ \sqrt{3} - \sqrt{2} } [/tex]
How can I work out 30% of (blank) is 60?
Solve for x. 10x^2=29x-21 does anyone know this
What is the algebraic expression for this story problem?A tank is filling with water from a natural spring well. Two days ago the water was 10 feet deep, and ye
White phosphorus, P4, is prepared by fusing calcium phosphate, Ca3(PO4)2, with carbon, C, and sand, SiO2, in an electric furnace.2Ca3(PO4)2(s) + 6SiO2(s) + 10C(
How can I work out 30% of (blank) is 60?
Would there be a problem or a major event in a horror story?