cvillalpando812 cvillalpando812
  • 24-09-2022
  • Mathematics
contestada

A fiber optic cable company is installing cable along a road 6 1/2 miles long. The crew takes a day to install each 1/4 mile of cable. How many days will the installation take?

A fiber optic cable company is installing cable along a road 6 12 miles long The crew takes a day to install each 14 mile of cable How many days will the instal class=

Respuesta :

Otras preguntas

What is your idea of a devoted friend?
The measure of each interior angle of a regular polygon is eleven times that of an exterior angle how many sides does the polygon have
Certain amino acids are called essential because they ______.
Write 7.085 × 10-14 as an ordinary number 0.000 000 000 007 085 0.000 000 000 000 708 5 0.000 000 000 000 0708 5 0.000 000 000 000 0070 85
Daniel uses his laptop computer in class to take notes because he believes that it a more efficient way to take notes. He thinks it will improve his grades beca
Oxygen and carbon dioxide are transported between the blood and interstitial fluid by way of
In the united states, ____ percent of the adults ages 20 and over are obese.
What is one beneficial thing about using estimation
How much did gore win the popular vote by?
how did the stamp act affect the colonial elites