ishmael4820 ishmael4820
  • 21-09-2022
  • Mathematics
contestada

a machine operator can program machine #1 to produce 100 parts per hour, but the machine requires 2 hours of service each day when it is not operating. machine #2 can produce only 80 parts per hour, but only requires 30 minutes of service each day. which machine is more productive in an eight hour work day?

Respuesta :

Otras preguntas

Given the points (-2,0)and(4,2) find the slope in y=Mx+b
Problem Elizabeth I faced outside her country
solve pls brainliest
Who is the president of the Senate and what is his or her importance in this role? ​
hiiiii if anyone can do these i would love you forever
Melissa runs a graphic design business. She charges by the page, and has a setup fee. The table shows her earnings for the last few projects. What is her per-pa
Based on the chemical equation, use the drop-down menu to choose the coefficients that will balance the chemical equation: ( )Zn + ( )HCl → ( )ZnCl2 + ( )H2
sin10°-cos10° product and evaluate​
The black graph is the graph of y=f(x). Choose the equation for the red graph plz help
Ranjan has bread in the morning or Ranjan had bread in the morning